From waste room to rooftop — every detail tracked
Bin Chutes keeps your entire installation team on the same page — floor progress, access panel sign-offs, shop drawings and site photos, all in one place.
Replace the chaos with a system that works
Bin Chutes was built specifically for the way chute installation teams operate on site.
Chasing progress through WhatsApp threads
Every floor logged in real time, searchable instantly
Paper sign-off sheets lost on site
Digital access panel register with electronic sign-off
Scrambling to work out what's finished before invoicing
The office dashboard shows what's done and what's outstanding, live
No single source of truth for the team
One system — every project, building, and chute system

Purpose-built for the trade
Built for the real pace of construction
Every floor, every chute, every handover — tracked from slab to sign-off.
See it in action
Designed for installers on site — fast to update, clear to read, even without signal.

Project overview
Live progress ring, building specs, shop drawings, and photo gallery in one screen.

Floor-by-floor tracking
Chutes and doors tracked per level with comments. Top floor checklist built in.

Bin room tracking
Equipment progressions for splitter, hopper, linear, and more — per building.
Everything your team needs, ground to top floor
Not generic project management adapted to fit — built around the real workflow of bin chute installation.
Floor-by-floor progress tracking
Record chute and door installation status for every floor across every chute system. Bypass floors, offsets, and partial progress all handled cleanly.
Access panel electronic sign-off
Log who received panels, how many, and which buildings and systems they cover. No paper. No double entry. Timestamped and searchable.
Office dashboard & invoicing summary
The office sees live progress from any browser: completed and outstanding work per building, chutes, doors, bin room and top floor, ready for invoicing.
Bin room & equipment register
Track all bin room equipment per building — A-type, hopper, carousel, compactor. Segment-style views replace long checklists.
Project & building management
Organise every job by building, then break each building into its chute systems — Garbage, Recycling, Linen, Organic, Glass and more.
Team roles & client access
Invite installers, managers, and client reps with the right level of access. Client reps see only their assigned projects — nothing else.
How it works
Get your team set up and tracking installations in minutes.
Create your workspace
Set up your company workspace and invite your team with the right roles.
Add projects and buildings
Create a project for each job site, add buildings, and define the chute systems.
Track installation on site
Installers update floor-by-floor progress directly in the app — in real time, offline-capable.
Invoice from the office dashboard
The office opens the dashboard and sees exactly what each crew completed, with signed access panel sign-offs and site photos as evidence.
Ready to ditch the paper trail?
Get your team on Bin Chutes and run cleaner projects from day one.